Illinois Road Construction 2025
Illinois Road Construction 2025. This bridge is anticipated to open in early 2025. 31st street over the ryan bridge repairs begin may 2. Laraway road (jackson branch creek to cedar road); Air mobility drive extension from illinois 161 to illinois 158/177 includes new construction.